THOUSANDS OF FREE BLOGGER TEMPLATES »
Showing posts with label Home projects. Show all posts
Showing posts with label Home projects. Show all posts

Monday, January 12, 2009

Cleansing

I've started the process of selling some of my mom's things on eBay. This is an extremely cathartic process for me. I've kept a lot of the things she left me, but even she told me that she knew I didn't like ALL the stuff she had, and to keep only what I wanted. I've kept a lot of her Depression glass, but there's just too much.

Most of it will be Depression glass, Asian art & figurines, plus some shabby chic style things. I only have a couple things on there now, as I'm slowly dipping my toes into this "selling on the Internet" business. Buying stuff off the web I'm used to, selling, not so much.

Monday, October 06, 2008

Return of the bathroom posts

The last time I mentioned my bathroom (the one that reeked of cat pee, if you'll remember) we had a new floor, courtesy of a friend of Jeff's. The original idea was the peel and stick vinyl floor tiles. That ended up not happening, as time was against me. So Jerry came in and within 6 hours, had put in beautiful ceramic tile. So, we had a floor, which was great, but the walls were still covered in gawd awful pastel Hawaiian print wallpaper. So, I ripped it off. (See previous posts about my lack of forethought on home improvement projects) That worked for about 75% of the wallpaper, while the rest was stuck on with industrial strength adhesive. I was reduced to spraying the walls with water, letting it soak in, and then using a putty knife to try and scrape off the adhesive. This was tearing the crap out of the drywall and driving me insane. So, this weekend, Jeff had had enough and said "Family trip to Home Depot, this bathroom is getting finished." So off we went, for primer, paint, and supplies. I also found this wallpaper remover, Dif, that helped me get the majority of the adhesive off. I immediately went to work. I used the Dif, and then on Sunday morning, prepared to paint. I taped off everything, and put on 1 coat of primer. I then put on 2 coats of "Raindrop", a subtle lavender color voted by a majority (I was out-voted 2-1, I wanted "Sweet Blue", which was a bit darker). It's hard to take pictures of a room that is less than 9x7 feet, and have them be color accurate. But, I can do some contrast pictures, to give you an idea.



Plus, here are some pics of the ceramic tile floor.







It's still not fully finished (I have to put the 75 pound mirror back on the wall, plus, I still need new baseboards) but it's fully functional, without looking like people were showering in the middle of a construction project.

ETA: I don't know why the pictures aren't showing up, but it's late and I'm new to Flickr, so if anyone could e-mail with how to have them show up on here, that would be awesome!

Monday, September 01, 2008

First week down

Wow, I am almost too exhausted to be awake. This week kicked my butt. It isn't really school or work that's been hard: it's been childcare. Emma doesn't start school until tomorrow, so I needed someone to watch her all last week while I was gone. Sarah & Katie's sitter didn't have room, so I was scrambling last Sunday night, calling everyone I knew. I ended up doing a combo of 2 people. Emma had fun at both places, so it worked out. Now I have a new dilemma: Emma starts school tomorrow, but only has a half day. WTH is with that?? What's the point? :sigh: Anyhow, I'm probably going to have to skip work, which I've already talked about with my supervisor. The person I would be working with is cool with being by herself, working both desks. I hate doing it, but I also hate having to keep calling on favors from people I know.

I'm still working on getting the front bathroom ready to paint. I've been taking down the awful wallpaper for a couple weeks now. 80% of it came down with no issues, just removed the top layer and sprayed the brown paper bag looking underlayer with water and gently scraped off using a putty knife. But some of it looks like it was glued to the wall with something other than the regular adhesive. And it's not been fun trying to get it all off. So my plan to have it done by the time school started isn't going to be realized but hey, what can you do? I took down the gigantic and extremely heavy mirror in order to get the wallpaper off underneath. I may have to rethink putting that thing back up there. Or I may end up framing it in wood. I think it would make it look a lot nicer. Once everything is finished I'll finally take some pics to post. When the bathroom doesn't look like it's a warzone.

Tuesday, July 01, 2008

Bathroom Update #4...I think

Yay!! Toilet is now disengaged from my floor!! To quote Jeff as we were able to successfully remove the stubborn bolt,"Those Home Depot guys are freaking geniuses." ROFL

I took off the rest of the luan flooring this afternoon, but my goal to have at least 1 coat of the Kilz on before the girls got home from camp was not realized. That flooring took a lot out of me. But, I am determined to work on it again once the girls go to bed. If I can get the 2 coats I want on there before tomorrow morning, then I can head to Home Depot to get the new luan flooring and install it tomorrow afternoon! See? There is a method to my madness.

Monday, June 30, 2008

The bathroom gods are against me

Ok, this bathroom is becoming a major thorn in my side. I have (almost) all the supplies I need, I just need to get the floor into a state where I can start. That involves unhooking the toilet and getting it out of the way for the time being. I knew what to do but a toilet is a huge porcelain PITA (pain in the a$$) and I didn't want to risk breaking it and having "new toilet" be part of my bathroom remodeling expenses. So I waited to request Jeff's help in moving it this weekend.

Well, the toilet has decided it doesn't WANT to be moved and is staying put. There seems to be something wrong with one of the nut/bolt thingies that secure the toilet to the floor. The top nut can be moved, but the ENTIRE nut/bolt/nut system is moving together, meaning nothing is coming off. And since the other nut is on the UNDERSIDE of the toilet, which we can't get to, we're at a loss as to how we're going to keep that one secure in order to get the top nut off. This whole thing makes my brain hurt....

And once again I have a time limit. Not like I wanted to still be doing this 2 weeks after I started. I wanted it done within 4 days, which was feasible at the time. But houses are fickle things. And I have 3 little distractions who don't like me working on the bathroom while they're at home/awake. But now that Emma & Sarah are at speech camp (Emma all day, Sarah in the afternoon) and Katie is now taking naps in the afternoon, I have almost 2 1/2 hours in order to work on it!! But, this still requires that the stupid toilet be detached from it's current position. So, it's another trip to Home Depot for me. I think they're gonna know me by name soon.